Central Heating Plant
43 River Road
听
In 1988 the central heating plant was renovated to include a wood chip boiler and chip storage bin.
Amenities
| Wireless | No | 
|---|---|
| Study Space | No | 
| Lounge Area | No | 
| Computer Access | No | 
| Food Services | No | 
听
43 River Road
听
In 1988 the central heating plant was renovated to include a wood chip boiler and chip storage bin.
| Wireless | No | 
|---|---|
| Study Space | No | 
| Lounge Area | No | 
| Computer Access | No | 
| Food Services | No | 
听